Advertisement Details
2021Back
On-time Delivery of Escalator Deflector Brush - AOQUN

On-time Delivery of Escalator Deflector Brush - AOQUN

3rd Floor, AB Building, No. 333 South Panyu Avenue, Dongchong Town – Guangzhou – China, Guandong020-84858360Facebook
Twitter
https://www.aoqunbrush.com/
Source
Guangzhou.
65 Crossingssee all
Guangzhou (China, Guandong) - Air (Coordinated transport)Guangzhou (China, Guandong) - GCC (Arabian blocs)
Guangzhou (China, Guandong) - Singapore City (Singapore)Guangzhou (China, Guandong) - Bogota (Colombia)
Guangzhou (China, Guandong) - Africa 4.0 (Continents)Guangzhou (China, Guandong) - Mexico city (Mexico)
Guangzhou (China, Guandong) - Anping County (China, Bohai Bay)Guangzhou (China, Guandong) - Andean Community (American blocs)
Guangzhou (China, Guandong) - Montevideo (Uruguay)Guangzhou (China, Guandong) - New Delhi (India)
Guangzhou (China, Guandong) - Homemade (Energy ad hoc)Guangzhou (China, Guandong) - CEFTA (European blocs)
Guangzhou (China, Guandong) - casablanca (Morocco)Guangzhou (China, Guandong) - Tel Aviv (Israel)
Guangzhou (China, Guandong) - World 4.0 (All countries)Guangzhou (China, Guandong) - Shenzhen (China, Guandong)
Guangzhou (China, Guandong) - Havana (Cuba)Guangzhou (China, Guandong) - Industry 4.0 (China - Africa)
Guangzhou (China, Guandong) - Miami (USA, East Coast)Guangzhou (China, Guandong) - Manila (Philippines)
Guangzhou (China, Guandong) - Commonwealth (Economic Blocs)Guangzhou (China, Guandong) - Belt and Road 4.0 (Coordinated Routes)
Guangzhou (China, Guandong) - San Jose (Costa Rica)Guangzhou (China, Guandong) - ASEAN (Asian blocs)
Guangzhou (China, Guandong) - Madrid (Spain)Guangzhou (China, Guandong) - EAC (African blocs)
Description

Mr. Zeng, the escalator and elevator manufacturer from Hubei province, came to AOQUN on January 3. The escalator deflector brush supplier they cooperated with before often delayed the delivery date, which directly affected their production schedule and received customer complaints for many times. They need to replace with a large escalator deflector brush manufacturer to cooperate with.

After knowing the situation, Miss Gui, our business manager, contacted Mr. Zeng, tell him that AOQUN has 15 sets automatic escalator deflector brush production machinery, their daily output is 58,027 meters, can fully meet customer’s delivery requirements. Then Miss Gui sent the samples according to Mr. Zeng's drawings within 3 days, and delivered the first batch of escalator deflector brush 5 days in advance. The quality and delivery time of AOQUN escalator deflector brush were all confirmed by Mr. Zeng.

After providing three batches of goods successfully, AOQUN received Mr. Zeng's feedback. With AOQUN’s good cooperation, their current delivery date has been guaranteed, and the orders of old customers have also been significantly improved. AOQUN is the best escalator deflector brush manufacturer they have ever worked with on escalator deflector brush. Finally, the annual orders was successfully placed to AOQUN.

http://www.aoqunbrush.com/

Trade
Alliance
Include thirds
Send message
Follow user
Multimedia files
On-time Delivery of Escalator Deflector Brush - AOQUN
Comments
New Comment
Submit